Sebil Hydroelectric Power Plant was built in 2015 in Camlıyayla district of Mersin province. Its total powercapacity is 25.152 MWm and 75 GWh energy is produced annually.
Project Details
Total Power: 25.152 MWm – 22.636 MWe Annual Total Production: 75,028 GWh Types Of Turbine: Horizantal Francis Flow: 16,75 m3 Mechanical Power: 2 X 11,906 MWm Electric Power: 2 X 11,318 Mwe Year Of Construction: January 2015
Annual Production Capacity of 1.2 GW