Kesme Hydroelectric Power Plant was built in Pazarcik district of Kahramanmaras province in 2011. Total power is 4.852 MWm and 16.077 GWh energy is produced annually.
Project Details
Total Power: 4.852 MWm – 4.609 Mwe Annual Total Production: 16,077 GWh Types Of Turbine: Horizontal Kaplan Flow: 23 m3 Mechanical Power: 2 X 2,426 MWm Electric Power: 2 X 2,3047 MWe Year Of Construction: 2011
Annual Production Capacity of 1.2 GW