Hacibey Wind Power Plant started to be built in İstanbul province Çatalca district in 2020. Total power is 65.200 MWm and energy will be generated as 204,16 GWh per year.
Project Details
Total Power: | 65.200 MWm - 52.500 MWe |
Annual Total Production: | 204,16 GWh |
Types Of Turbine: | VESTAS V162 |
Central Summit: | 125 Meter |
Rotor Diameter: | 162 Meter |
Number of Units: | 18 |
Year Of Construction: | Completed |
Annual Production Capacity of 1.2 GW