POWER PLANTS

Gemkopru - Hydroelectric Power Plant

Gemkopru - Hydroelectric Power Plant

Gemkopru Hydroelectric Power Plant was built in Erkenek district of Malatya province in January 2018. Total power capacity is 2.000 MWm / 1.900 MWe and 12.000 MWh energy is produced annually.

Project Details

Total Power:

2.000 MWm / 1.900 MWe
Annual Total Production:                    
12.000 MWh
Types Of Turbine:
Horizantal Francis
Flow:
2,2 m3
Mechanical Power:
2 X 1,00 MWm
Electric Power:
2 X 0,95 Mwe
Year Of Construction:
January 2018


Kivanc Solar Panels

Annual Production Capacity of 1.2 GW

This website uses cookies to ensure you get the best experience on our website.