Gemkopru Hydroelectric Power Plant was built in Erkenek district of Malatya province in January 2018. Total power capacity is 2.000 MWm / 1.900 MWe and 12.000 MWh energy is produced annually.
Project Details| Total Power: | 2.000 MWm / 1.900 MWe | 
| Annual Total Production: | 12.000 MWh | 
| Types Of Turbine: | Horizantal Francis | 
| Flow: | 2,2 m3 | 
| Mechanical Power: | 2 X 1,00 MWm | 
| Electric Power: | 2 X 0,95 Mwe | 
| Year Of Construction: | January 2018 | 
Annual Production Capacity of 1.2 GW